Resource Traffic Light indicator

$
0
0

Hi All, just wondering if anyone has experience setting up a calculated traffic light that provides insights into the status of the schedule. Something like:

  • Majority of tasks do not have any resources - Red
  • Majority of tasks use a Generic Resource - Amber
  • Majority of tasks use named resources - Green

I had a quick look and see you can use Resource fields like "Group", "Overallocation", "Max Units" in calculatedtask fields. Which looks promising. However I could only get the Group field to return meaningful data.

If I set my generic resources to have a Group value of "Generic" and my named resources to have a Group value of "Named" - then I think I could return the resource category and perform a test to see which value/s are returned on a task by task level and then pass up a project level traffic light.

However I would also like to add a layer of sophistication regarding if the resource is overallocated. Just wondering if anyone has done this before and can give me some pointers before I spend some serious time investigating.

Many thanks..



Microstrategy Application is being blocked by some unknown process

$
0
0
 Microstrategy Application is being blocked by some unknown process in windows server and we could not identify what is blocking that? Can anyone help me reagrding this inordert o complete my project ?

GeneralQueueJobFailed after new project publication on PS 2013 SP1 + CU OKT 2015

$
0
0

Hi all, I have GeneralQueueJobFailed after new project publication on PS 2013 SP1 + CU OKT 2015. This project was created via PWA. Error detail:«Queue:◦GeneralQueueJobFailed (26000) - PSPermissionSynchronizePWASite.PSPermissionSynchronizePWASiteMessage. Details: id='26000' name='GeneralQueueJobFailed' uid='f8f1193f-f59c-e511-93f9-000c296682c7' JobUID='f2f1193f-f59c-e511-93f9-000c296682c7' ComputerName='a991581a-7df9-4eea-8672-a54cf19fde1d' GroupType='PSPermissionSynchronizePWASite' MessageType='PSPermissionSynchronizePWASiteMessage' MessageId='1' Stage='' CorrelationUID='f3f2489d-a633-60f9-0000-0d832fd756ba'. For more details, check the ULS logs on machine a991581a-7df9-4eea-8672-a54cf19fde1d for entries with JobUID f2f1193f-f59c-e511-93f9-000c296682c7.» My account in Project Server Administrators group.

ULS Logs:

12/08/2015 01:14:46.53     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Sharepoint Integration            adl8x    Medium      PWA:http://projects.dv.rt.ru, ServiceApp:Project Service Application, User:i:0#.w|dv\dvdr-pj-ks, PSI: [QUEUE] HandlePSPermissionSynchronizePWASiteMessag: Unexpected error occurred while applying global permission states to PWA site, LogLevelManager Warning-ulsID:0x000CB897 has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.53     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Sharepoint Integration            aeqz7    Exception    An unexpected exception occured while processing queue messages of type PSPermissionSynchronizePWASite System.ArgumentException: Trying to get name of an SPWeb at the root web app is not allowed.  Parameter name: web     at Microsoft.Office.Project.Server.BusinessLayer.SharePointSecurityHelper.GetWebName(SPWeb web)     at Microsoft.Office.Project.Server.BusinessLayer.SharePointSecurityHelper.GetGroupNameByPermissionUID(SPWeb web, Guid feaActUid)     at Microsoft.Office.Project.Server.BusinessLayer.PSPermissionSynchronizer.<>c__DisplayClass5.<>c__DisplayClass8.<ApplyGlobalPermissionState>b__4(Guid feaActUid)     at Microsoft.Office.Project.Server.BusinessLayer.PSPermissionSynchronizer.ApplyDeltaPermissionsToSPWeb(IPlatformContext context, SPWeb web, SharePointSecurityHelper sharepointHelper...    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.53*    Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Sharepoint Integration            aeqz7    Exception    ..., IEnumerable`1 permissions, Func`2 getAssociatedGroup)     at Microsoft.Office.Project.Server.BusinessLayer.PSPermissionSynchronizer.<>c__DisplayClass5.<ApplyGlobalPermissionState>b__3()     at Microsoft.SharePoint.SPSecurity.<>c__DisplayClass5.<RunWithElevatedPrivileges>b__3()     at Microsoft.SharePoint.Utilities.SecurityContext.RunAsProcess(CodeToRunElevated secureCode)     at Microsoft.SharePoint.SPSecurity.RunWithElevatedPrivileges(WaitCallback secureCode, Object param)     at Microsoft.SharePoint.SPSecurity.RunWithElevatedPrivileges(CodeToRunElevated secureCode)     at Microsoft.Office.Project.Server.BusinessLayer.PSPermissionSynchronizer.ApplyGlobalPermissionState(IPlatformContext context, SharePointSecurityHelper sharepointHelper, PSPermissionSyncState deltaState)     at Microsoft...    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.53*    Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Sharepoint Integration            aeqz7    Exception    ....Office.Project.Server.BusinessLayer.Queue.ProcessPreparePSPermissionSynchronizationMessage.HandlePSPermissionSynchronizePWASiteMessage(PSPermissionSynchronizePWASiteMessage msg, MessageContext mContext)     at Microsoft.Office.Project.Server.BusinessLayer.Queue.ProcessPreparePSPermissionSynchronizationMessage.HandleMessage(Message msg, Group messageGroup, JobTicket jobTicket, MessageContext mContext) StackTrace:  at Microsoft.Office.Project.Server.Native.dll: (sig=134ce9b5-648a-4c93-8b48-a364a0364a09|2|microsoft.office.project.server.native.pdb, offset=3C16) at Microsoft.Office.Project.Server.Native.dll: (offset=1265D)    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.53     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Unified Logging Service           c91s    Monitorable    Watson bucket parameters: Microsoft Project Server 2013, ULSException14, 070f6ea0 "project server", 0f0011d9 "15.0.4569.0", 9c2bade2 "microsoft.office.project.server", 0f001299 "15.0.4761.0", 55ee6944 "tue sep 08 14:51:16 2015", 00000fc3 "00000fc3", 0000000d "0000000d", 44395864 "argumentexception", 00110661 "aeqz7"   f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.53     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue Jobs                       954l    Medium      PWA:http://projects.dv.rt.ru, ServiceApp:Project Service Application, User:PROJECTSERVER\system, PSI: [QUEUE] Message not processed: Group: f3f1193f-f59c-e511-93f9-000c296682c7 MsgId: 1 Type: PSPermissionSynchronizePWASite, LogLevelManager Warning-ulsID:0x3935346C has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.53     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue                            b0rl    Medium      PWA:, ServiceApp:Unknown, User:Unknown, PSI: UnknownUnknown[QUEUE] noop EndMessageGroup f3f1193f-f59c-e511-93f9-000c296682c7 type = PSPermissionSynchronizePWASite priority = StandardPriority, LogLevelManager Warning-ulsID:0x6230726C has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue                            ad3fy    Critical    Standard Information:PSI Entry Point: <unknown>  Project User: <unknown>  Correlation Id: <unknown>  PWA Site URL:   SA Name: <unknown>  PSError: <unknown> A queue job has failed. This is a general error logged by the Project Server Queue everytime a job fails - for effective troubleshooting use this error message with other more specific error messages (if any), the Operations guide (which documents more details about queued jobs) and the trace log (which could provide more detailed context). More information about the failed job follows. GUID of the failed job: f2f1193f-f59c-e511-93f9-000c296682c7. Name of the computer that processed this job: a991581a-7df9-4eea-8672-a54cf19fde1d (to debug further, you need to look at the trace log from this computer). Failed job type: PSPermissionSynchr...    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54*    Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue                            ad3fy    Critical    ...onizePWASite. Failed sub-job type: PSPermissionSynchronizePWASiteMessage. Failed sub-job ID: 1. Stage where sub-job failed:  (this is useful when one sub-job has more than one logical processing stages).    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue Jobs                       ad3fy    Medium      Error is: GeneralQueueJobFailed. Details: Queue Attributes:  f2f1193f-f59c-e511-93f9-000c296682c7  a991581a-7df9-4eea-8672-a54cf19fde1d  PSPermissionSynchronizePWASite  PSPermissionSynchronizePWASiteMessage  1    f3f2489d-a633-60f9-0000-0d832fd756ba  . Standard Information: , LogLevelManager Warning-ulsID:0x000DD158 has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Project Server Database           ah91z    Medium      Successfully got the connection string (database name=[PWA_Content], id=920d45b0-6a04-41f3-b2d5-a6740aea94c3, type=Consolidated). Requested access level=ReadWrite: Data Source=SDVDR002PJ001;Initial Catalog=PWA_Content;Integrated Security=True;Enlist=False;Pooling=True;Min Pool Size=0;Max Pool Size=100;Connect Timeout=15    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x1994    Project Server                    Project Server Database           ah91z    Medium      Successfully got the connection string (database name=[PWA_Content], id=920d45b0-6a04-41f3-b2d5-a6740aea94c3, type=Consolidated). Requested access level=ReadWrite: Data Source=SDVDR002PJ001;Initial Catalog=PWA_Content;Integrated Security=True;Enlist=False;Pooling=True;Min Pool Size=0;Max Pool Size=100;Connect Timeout=15    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue Jobs                       ad3fz    Medium      PWA:http://projects.dv.rt.ru, ServiceApp:Project Service Application, User:PROJECTSERVER\system, PSI: [QUEUE] receiver http://projects.dv.rt.ru: Group f3f1193f-f59c-e511-93f9-000c296682c7 type = PSPermissionSynchronizePWASite aborted at Message 1, LogLevelManager Warning-ulsID:0x000DD159 has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Queue Jobs                       ad3f2    Medium      PWA:http://projects.dv.rt.ru, ServiceApp:Project Service Application, User:PROJECTSERVER\system, PSI: [QUEUE] receiver http://projects.dv.rt.ru: Group f3f1193f-f59c-e511-93f9-000c296682c7 correlation c62d5f54-9970-4718-90fe-bd835953838a type = PSPermissionSynchronizePWASite failed at Message 1 Errors: GeneralQueueJobFailed, LogLevelManager Warning-ulsID:0x000DD15C has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Project Server Database           ah91z    Medium      Successfully got the connection string (database name=[PWA_Content], id=920d45b0-6a04-41f3-b2d5-a6740aea94c3, type=Consolidated). Requested access level=ReadWrite: Data Source=SDVDR002PJ001;Initial Catalog=PWA_Content;Integrated Security=True;Enlist=False;Pooling=True;Min Pool Size=0;Max Pool Size=100;Connect Timeout=15    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.54     Microsoft.Office.Project.Server (0x06EC)    0x1994    Project Server                    Project Server Database           ah91z    Medium      Successfully got the connection string (database name=[PWA_Content], id=920d45b0-6a04-41f3-b2d5-a6740aea94c3, type=Consolidated). Requested access level=ReadWrite: Data Source=SDVDR002PJ001;Initial Catalog=PWA_Content;Integrated Security=True;Enlist=False;Pooling=True;Min Pool Size=0;Max Pool Size=100;Connect Timeout=15    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.55     Microsoft.Office.Project.Server (0x06EC)    0x1994    Project Server                    Server-side Project Operations    ado0g    Medium      PWA:http://projects.dv.rt.ru, ServiceApp:Project Service Application, User:i:0#.w|dv\dvdr-pj-ks, PSI: [QUEUE] SynchronizeTaskListInManagedModeMessage, LogLevelManager Warning-ulsID:0x000CE686 has no entities explicitly specified.    f3f2489d-a633-60f9-0000-0d832fd756ba
12/08/2015 01:14:46.55     Microsoft.Office.Project.Server (0x06EC)    0x0C28    Project Server                    Project Server Database           ah91z    Medium      Successfully got the connection string (database name=[PWA_Content], id=920d45b0-6a04-41f3-b2d5-a6740aea94c3, type=Consolidated). Requested access level=ReadWrite: Data Source=SDVDR002PJ001;Initial Catalog=PWA_Content;Integrated Security=True;Enlist=False;Pooling=True;Min Pool Size=0;Max Pool Size=100;Connect Timeout=15    f3f2489d-a633-60f9-0000-0d832fd756ba

After migration to Project 2013 from Project 2010. Error Occured while opening your Project for Edit

$
0
0

Hello.  After migration to Project 2013  from Project 2010. Error Occured while opening your Project for Edit.  Some project open normally, some not.  

PWA show message:

"An error occurred while opening your project. Give us a few minutes and try again. If this happens again, contact your administrator"

In ULS

CalcServiceManager : Communication with the worker failed while opening project guid: 9efc0fa2-23b6-4b3a-9931-dc1f5750cb58 System.ServiceModel.FaultException: The server was unable to process the request due to an internal error.    Server stack trace:      at System.ServiceModel.Channels.ServiceChannel.HandleReply(ProxyOperationRuntime operation, ProxyRpc& rpc)     at System.ServiceModel.Channels.ServiceChannel.Call(String action, Boolean oneway, ProxyOperationRuntime operation, Object[] ins, Object[] outs, TimeSpan timeout)     at System.ServiceModel.Channels.ServiceChannelProxy.InvokeService(IMethodCallMessage methodCall, ProxyOperationRuntime operation)     at System.ServiceModel.Channels.ServiceChannelProxy.Invoke(IMessage message)    Exception rethrown at [0]:      at System.Runtime ...Remoting.Proxies.RealProxy.HandleReturnMessage(IMessage reqMsg, IMessage retMsg)     at System.Runtime.Remoting.Proxies.RealProxy.PrivateInvoke(MessageData& msgData, Int32 type)     at Microsoft.Office.Project.Server.BusinessLayer.PcsEngine.IPCSPipe.LoadProject(Guid ulsCorrelation, Guid projUid, String projectName, Boolean isOldVersion, ProjectAdminSettings projectAdminSettings)     at Microsoft.Office.Project.Server.BusinessLayer.PcsEngine.WorkerChannel.LoadProject(Guid ulsCorrelation, Guid projUid, String projectName, Boolean isOldVersion, ProjectAdminSettings adminSettings)     at Microsoft.Office.Project.Server.BusinessLayer.PcsEngine.WorkerProxy.LoadProject(Guid ulsCorrelation, Guid projUid, String projectName, Boolean isOldVersion, ProjectAdminSettings adminSettings)    at Microsoft Office.Project.Server.BusinessLayer.CalcServiceManager.OpenProjectRemappedProject(CalcServiceCallState callState, Guid realProjectGuid, Guid remappedProjectGuid, EngineSessionState& sessionState, EngineSessionType sessionType, PSError& psError) StackTrace:  at Microsoft.Office.Project.Server.Native.dll: (sig=ad0ca0fd-3c62-4564-9144-b6fd1f587187|2|microsoft.office.project.server.native.pdb, offset=3C16) at Microsoft.Office.Project.Server.Native.dll: (offset=1265D)

I check for open project with admin rights. Project does not have blank rows. I am not able to edit the project in MSP. I run the browser in IE10 compatible mode, and this not help me. 


Changing date format in Project Server 2013

$
0
0

Hi Project Server Experts,

Can we change the date format in Project Server 2013 to format like 30 May 13. Example below the Start and Finish columns has numerical date format I need to change it to format like 30 May 13. Can I do so, if yes then how?

Thanks.

User Synchronization (Delete Operation) taking extremely long

$
0
0

We are running Project Server 2010 SP2. We manually add users to the Project Server Security group instead of using AD synchronization. Beginning yesterday, the User Synchronization (Delete Operation) that is started after editing a user began running indefinitely. We typically average about 100 seconds (we have 4000 project sites) but with several users yesterday, the job continued to run all day. We eventually cancelled the job and were able to run a few users with normal run times, but now the job is running for hours again.

Our SharePoint admin restarted the events and Queue Services, which had the jobs start over again, but they are still running. any help will be greatly appreciated.

Thank you.


-Jim

Difference between Descendant and Direct Descendant in Category Permission for Resources??

$
0
0

Hi Experts

I have been struggling to find this difference since last few days. I am just wondering if anyone has ever worked out this before?? Please advice me on this.

TIA


Manish

Need guidance on what required to run

$
0
0

I'm beyond confused right now on what's required to run project sever 2013. I was under the impression I need Sharepoint, SQL Standard, and ms project server. 

I plan on ordering a 2 processor 12C 24T with 64gb of ram with vsphere. I ask dell for a quote on Sharepoint, SQL, and all required software and what they came back with confused me more. We will have 5-10 users..

This is Project Server pricing.  Below is Licensing as well as Licensing plus Software Assurance.  Each user will need a CAL, and SA is required for HA (mobility rights) in a virtual environment.

ProductType

PoolName

ProductFamily

PartNumber

DOMS A Sku

ItemName

Cost +

Standard

Servers

Project Server

H22-02465

A7548270

PrjctSvr 2013 SNGL OLP NL

$         5,479.88

License/Software Assurance Pack

Servers

Project Server

H22-00316

A7597113

PrjctSvr SNGL LicSAPk OLP NL

$         8,251.86

Standard

Servers

Project Server CAL

H21-03306

A7263382

PrjctSvrCAL 2013 SNGL OLP NL UsrCAL

$             211.96

License/Software Assurance Pack

Servers

Project Server CAL

H21-00546

A7597114

PrjctSvrCAL SNGL LicSAPk OLP NL UsrCAL

$             319.18

 

Here is pricing for SharePoint.  SharePoint Enterprise CALs are add on CALs in addition to the Std CAL and required for Project Server.  Pricing below includes License only and License plus SA.  SA is required for HA (mobility rights) in a virtual environment

ProductType

PoolName

ProductFamily

PartNumber

DOMS A Sku

ItemName

Cost +

Standard

Servers

SharePoint Enterprise CAL

76N-03701

A7058571

SharePointEntCAL 2013 SNGL OLP NL UsrCAL

$             104.34

License/Software Assurance Pack

Servers

SharePoint Enterprise CAL

76N-00839

A7597115

SharePointEntCAL SNGL LicSAPk OLP NL UsrCAL

$             157.12

Standard

Servers

SharePoint Standard CAL

76M-01518

A7058570

SharePointStdCAL 2013 SNGL OLP NL UsrCAL

$             118.41

License/Software Assurance Pack

Servers

SharePoint Standard CAL

H05-00391

A7058363

SharePointStdCAL SNGL LicSAPk OLP NL UsrCAL

$             178.37

Standard

Servers

SharePoint Server

76P-01501

A7058572

SharePointSvr 2013 SNGL OLP NL

$         6,575.84

License/Software Assurance Pack

Servers

SharePoint Server

H04-00221

A7597116

SharePointSvr SNGL LicSAPk OLP NL

$         9,902.46

 

SQL Enterprise is also required for Project Server.  SQL Enterprise is licensed per core with a minimum of 4 cores licensed per instance.  SA is also required for mobility rights in a virtual instance.

ProductType

PoolName

ProductFamily

PartNumber

DOMS A Sku

ItemName

Cost +

Standard

Servers

SQL Svr Enterprise Core

7JQ-00751

A7641443

SQLSvrEntCore 2014 SNGL OLP 2Lic NL CoreLic Qlfd

$       13,298.78

License/Software Assurance Pack

Servers

SQL Svr Enterprise Core

7JQ-00253

A7058529

SQLSvrEntCore SNGL LicSAPk OLP 2Lic NL CoreLic Qlfd

$       20,026.04


Viewing Resource Availability - Do projects have to be published to be viewed in the Resource Center after an upgrade from 2010 to 2013

$
0
0

All,

We recently upgraded from PS 2010 to PS 2013.  While I can see all of the projects (over 6,000) in the Project Center, the Resource Center (View Availability) does not list the projects.  The projects also do not show up in MSP Pro 2013 when viewing data under the Resource Usage View. 

They were all there before upgrading, and it is not a filter issue (none applied).  It appears if you open, save, and publish the schedules, the resource informaiton will then show in the Resource Center (View Availibility). 

So my question, is it a true fact that all schedules have to be opened, saved, and published prior to viewing Resource Data?

Converting Project Ideation to Projects and we get CreateWssSite job failed alerts.

$
0
0

When we try to convert a project from Project Ideations to a project we get CreateWssSite job failed alerts and the project site does not get created.

Your CreateWssSite job failed.  Its current state is FailedNotBlocking. It was 0% complete.  It entered the queue at 07/03/2015 15:03:54.

To get more information about the job failure, please go to Project Web App. Select Personal Settings from the left menu.  Then select My Queued Jobs.

The errors returned from the queue are as follows:

 Error ID: 16400

 Error ID: 26000

Detailed error below - send it to the administrator for more detailed troubleshooting.

<?xml version="1.0" encoding="utf-16"?>

<errinfo>

  <general>

    <class name="CreateWssSiteContent: Creating project site failed! Project Uid=9b68363c-b621-e511-80db-0050569d06d6, site URL=https://sharepoint.msufcu.org/projects/testrj, site name=testrj. Cannot attach workspace without either PWSVisibility or PWSManaged feature enabled">

      <error id="16400" name="WSSCreateSiteFailure" uid="7583a33e-b621-e511-80d6-0050569d0ded" projectUID="9b68363c-b621-e511-80db-0050569d06d6" workspaceUrl="https://sharepoint.msufcu.org/projects/testrj/testrj" projectWorkspaceName="testrj" />

    </class>

    <class name="Queue">

      <error id="26000" name="GeneralQueueJobFailed" uid="7683a33e-b621-e511-80d6-0050569d0ded" JobUID="af68363c-b621-e511-80db-0050569d06d6" ComputerName="2137bfb8-c220-4df4-8017-cb50976297c6" GroupType="CreateWssSite" MessageType="CreateWssSiteMessage" MessageId="1" Stage="" CorrelationUID="a877169d-c0c7-6038-e7a7-c6fe04cff939" />

    </class>

  </general>

</errinfo>

You can do the following:

1. Try troubleshooting using the error IDs, error XML.

2. Contact administrator with your jobID (af68363c-b621-e511-80db-0050569d06d6) and error XML.

To turn off these notifications, go to PWA Settings, and then click Manage My Alerts and Reminders.

From this page, you can clear the check box for those notifications you no longer want to receive.

Project Center


Ron Johnson Systems Administrator Michigan State University Federal Credit Union Office – (517) 333-2391 ron.johnson@msufcu.org WWW.MSUFCU.ORG

Project Server 2013 - Creating projects with duplicate names

$
0
0

what is the default functionality of Project Server 2013 when a user creates a project with the name that already exists? 

We just installed October 2015 CU and it seems that Project Server 2013 now doesn't give any warning when creating a project with the name that already exists. it simple creates a project with the same name and adds "_0" to it.  the users are not happy with it and ask us if this can be disabled. 


tatiana

Collaborate with a particular resource on a certain task. (task level collaboration)

$
0
0
Is there a way to collaborate with some other resource on a certain task (task level collaboration)? There is a 'notes' section in editing task but it does not provide collaboration features. Moreover, 'Discussion Board' also does not provide any way to link a certain discussion with a task.

How to raise support in Project Server on Premises

$
0
0

Hi,

Can anyone explain me the procedure for raising the support in project server 2013 on premises solution.

It would be a great help.

Thanks in Advance.

Abbas Khan



Project Server 2013 Project Evaluation

$
0
0

Hi All,

Is there is any simple way to evaluate the project objectives subjectively without using portfolio module. Link some objectives to the project and evaluate them at the closure of the project.


Thanks in advance, Taj

How to fetch TaskTimephased Data(Not assignment) in Project Server DB

$
0
0

Hello All,

I am in requirement to fetch MSPS Task Data (TaskCost,TaskActualCost) as Timephased in one report but as I start looking into the DB table,I see that we do not have Task Data timephased like we have Assignment Data.

As per my understanding,if we use  dbo.MSP_EpmAssignmentByDay we can fetch AssignmentCost or AssignmentActualCost etc TimeByDay but in the same way if we look for dbo.MSP_EpmTaskByDayor dbo.MSP_EpmTaskByDay_UserView,we do not see any Task Data(ActualCost or Cost etc) though we can see Baseline Task Data which we are not interested in.

Also,these tasks do not have entry in Assignment Table\views as no resources are assigned on it.

My understanding says its a tool design that it can not show Task Data in timephased manner but on the same theory I am not able to understand then why BaselineData(Baseline0Cost etc) are possible to fetch in timephased manner.

Anyone having knowledge on this,please share.

Thanks.



Project Online SSO - connection to Project Pro

$
0
0

Hi Experts,

While connecting to Project Professional on user's computer, from project online where SSO has been implemented - it always prompts for username and password - which is not resolving and users are unable to enter Project Professional.

For all other applications, users just have to enter their email id and SSO redirects further.

Please let me know what can be done here.

Thanks.


Best Regards, Anuja

Physical % Complete (PPC) Does Not Roll Up on New Tasks, Even After Baselining

$
0
0

Hello All,

We are using Project Server 2010.  We have been using Earned Value Management (EVM) to measure project performance.  We set the project to "Physical % Complete" and confirm that all of the tasks show PPC in the Earned Value Method field (Advanced tab).  However, on a recent project, we added new tasks and baselined those tasks separately.  However they do not roll up into the PPC value in the Summary Bar(s).

Since the tasks are already PPC/EVM and baselined, what steps do I follow to correct this roll-up issue?  I read on another post something about the Project Status Date (Project Information).  Our status date is Tuesdays (weekly).  Do the PM's need to change this date every week?  

Julie 

 

Project Server 2013 - PDP

$
0
0

Hi All,

We are implementing project server 2013. The below are the scenario.

1. We need retrieve some values from ERP and fill PDP fields

2. We need retrieve some values from AD and fill PDP fields

3. Retrieve some values SharePoint list and fill PDP

4. Based on the selection of the previous field value, the following column value need to be filled

In the above scenarios can we use the enterprise custom fields and default PDP or we use the solutions like InfoPath forms. Please suggest if there is any other way to achieve this.


Thanks in advance, Taj

The total size of the activity XAML including the referenced XAML is greater than the maximum allowed size of 51200 KB

$
0
0

The total size of the activity XAML including the referenced XAML is greater than the maximum allowed size of 51200 KB. HTTP headers received from the server - ActivityId: 0fb03b9d-8419-4f9e-a1a2-0e3800b473b6. NodeId: ""ServerName". Scope: /SharePoint/default/8938d375-e91c-4422-9bb1-cc89364b1335/7f6ff8aa-182f-4b36-b491-c5f7a8dd0714. Client ActivityId : 42d84b9d-2e0f-00eb-de56-4e48bdd8c.



"Upgrade-spsite -verionupgrade" command taking too much time to complete - Project server 2013

$
0
0

Hi,

We are upgrading from Project server 2010 to 2013, and in that process we run the command 

"upgrade-spsite -identity http://..../pwa -versionupgrade" and this command has completed on 15% after 2 days (48 hours). The size of the contentdabase, which holds the PWA site isonly 10 GB. The configuration of Project server 2013 and Database server is

8 Cores and 16 GB for each server (this is a 2 tier environment), theOS is Windows 2012 and SQL version is 2012 Enterprise. On SQL box we have stopped SSIS, SSRS and SSAS services. Both servers are virtual servers.

Please help me to speed-up this task and fix for this issue. Because I have found on internet that people have upgraded 250 GB of data is just 2 days.

Regards,

Meen Bamm