    Hi,
    Planned work for each task line by multiple resources -as shown below

    http://1drv.ms/1GE3XMB

    Can I get any report against each resource wherein he has planned work as in figure above ?
    I am able to get a report from task table where effort against each task -i got, but I wanted planned work/effort from every individual resource against that specific task,
    Can this be possible ?



    0 0
  • 06/27/15--18:07: Subproject to two projects?
  • Hello guys. 

    You managed to link a subproject to more than one master project in the project server 2010? 

    The problem is that I have projects that belong to more than one program and would like to have a program website and the websites of the projects , so I'm applying the concept of project and subproject, but the software does not allow . 

    They know how I can fix?

    0 0
  • 06/28/15--00:11: ROBERT B. SANDERS
  • HOW CAN I GET "WHAT'S UP'' ON MY LAP TOP COMPUTER?

    0 0

    Hi All,
         I have 2 issues

    1) When i login to project server and im on the homepage there is a project web app webpart i think project center that lists all the project sites.
    But there is a particular project that is not visible from there and everyone with high level access and full access cant see this project.

    I can get to the project site directly but not listed in project web app webpart  listing all the project sites.

    Also when i try to get to it directly like this:

    using the GUID ProjectUId :

    http://project.com/Project/Project%20Detail%20Pages/ProjectInformation.aspx?ProjUid=ef0940d3-e231-4522-90f2-ac21aa7655d2&ret=0

    I still get  Sorry, this site hasn't been shared with you

    2)      I cant access project server i mean the first home page as Site Collection Admin i get error
    Sorry, this site hasn't been shared with you.

    Any ideas why this is happening? Any advices?

    Cheers


    0 0

    I have Project Server 2013 On Premise in SharePoint permission mode. I want everyone in the company ('Everyone') to have read access to every new project site. I want to be able to do this without having to manually add after the project site is setup.

    I know the resources still need to be setup in PWA; I'm OK with that.

    I need to know if it is possible to have 'Everyone' have read access to every project site that would be created. All this in SharePoint permission mode.

    Thanks for any help!


    0 0

    Hello

    In PWA's Server Settings I have created an
    Enterprise Custom field as follows:

    Entity: Task

    Type: Cost

    As this is a cost field no look-up table or formula are assigned.

    There are no calculations for Summary or Assignment rows.

    Values to display: data.

    The field is available in MS Project
    Professional project plans for population.

    The field has been added in to the OLAP database
    (Cube Measures, Assignment cube), however even after a cube rebuild this field is not available to pull in to a PerformancePoint report (Analytic Chart or Grid) using Dashboard Designer.

    Could you please offer advice on how this field can be added to reporting in Dashboard Designer or where the set-up of the field should be changed?

    Thank you in advance.

    Jane



    0 0

    I have Project Server 2013 On Premise in SharePoint mode of permission. I'm familiar with the classic Project Server mode of permission. In the classic mode, a PM had to build team and publish project for read access AND assign task and publish project for write access.

    In the SharePoint permission mode, if a PM wants a new member to have access to project site (assuming the resource is setup, will the build team and assign task take care of it or will the PM have to manually add that person to the corresponding SharePoint group.


    0 0

    Hi,

    How many resources can be assigned to a task in MS Project 2013?

    Can we assign more than 20 resources to a task? Will that create any problem in MS Project Server 2013?


    K.Gokulraj


    0 0
  • 06/30/15--03:11: Top-Level Booking
  • Hi,

    We currently use top-level project bookings only with Enterprise Resources, and not at task-level placing resources against any part of the schedule.

    Is there any way of displaying any/total hours booked so far to a project actually within the schedule? i.e via a standard field or a custom field?

    We export time booked to top-level to an out of the box project server pivot-table spreadsheet, and the field used for time booked is 'Billable Actual Work'.  What feeds into this, or what reverse engineering is required to display this in MS Project?

    Using Project Server 2013, with MS Project 2013 Project Professional.

    Thanks,
    Andrew


    0 0
  • 06/25/15--00:59: Resource Levelling
  • Hi,

    I face Resource Overallocation issue in MS Project Server 2013.

    I tried levelling a resource using MS Project, when I click Resource Levelling, resource is levelled but for some days there is no allocation. (i.e. For instance a resource is overallocated for 2months, when I click levelling, all days he has been allocated 8hrs but few days no allocations(Gap) are there, I mean excluding holidays I see some gap)

    What is the cause of this problem?


    K.Gokulraj


    0 0

    when i try to open excel file from Reports get the below Error in project server 2013



    0 0

    Our organization will soon need to change some AD usernames because they will be duplicates in a future AD merge with a larger company that acquired our org. My assumption is our 2013 MS Project server will simply update any affected user's AD username through the daily AD sync that occurs, and the time sheets and assignments will not be adversely impacted because the resource names and AD groups will remain as they were. Is this a valid assumption?

    0 0

    Hello all,

    It is not possible to edit a project having sub-projects using PWA in Project Server 2010.  Is this now possible in Project Server 2013?

    Thanks,

    Ben


    0 0

    Hello, below is the issue / challenge scenario:

    I'mnt. We have to remove the smaller chunk of queries that are hitting the published database to get the user security permissions. I'm using custom SSRS reports that are pulling data from Reporting database and other custom financial SQL DB's. I need to figure out a solution to get the list of accessible projects for a particluar user using PSI. I did find this technet article that addresses my issue in a way

    http : // technet . microsoft . com/en-us/office/ee862408(v=office.14).aspx#pj2007_ta_SecurityInReports_DevelopingThePsiProxiesClassLibrary

     the above solution means that I need to change many of my existing report queries (going to published DB)

    Is there a simpler way to maintain a table that I can populate with the Project GUID's, name , user id, name using PSI? I can then refer the existing SQL's procs, TVF's to point to this table instaed of going to the published DB (unsupported method)

    Any help/ direction is greatly appreciated

    thanks,

    SG


    0 0

    Project Server 2010 environment:

    I'm going to a project site

    In Project Documents (where minor version control is turned on), I have a test document called "My Document Name"

    That document's Version History shows a lot of versions

    I want to compare two versions, so I open the document by clicking on the "My Document Name" link

    I click on Edit Document

    Then I select the Review tab

    Then I select Compare->Specific Version

    A window opens named "Versions saved for My Document Name.docx"

    It looks like this window should be populated with the various versions of the document, just like 'Version History'

    If you float the mouse in the window, you will see a busy cursor

    After about a minute the busy cursor disappears and this error pops up:

    "Versions cannot be accessed at this time, because the server is busy.  Please try again later."


    0 0

    Can anyone suggest why resource assignment work might be different when comparing the Resource Assignment view versus the Resource Availability Graph/data grid (ie the generic PWA views within Resource Center).   After making a change in the project plan and publishing the Resource Assignment view data is correct but the graph is not!  Does the graph run eg from the Reporting database and the assignment view from the Published database or should they be drawing on the same datasource? 

    This seems to be a new problem within the last day..

    thanks in advance

    Steve


    0 0

    HI,

    Can any one please tell me what is the use of these two services in project server 2013.

    Microsoft Project Server Calculation Service 2013

    Microsoft Project Server Events Service 2013

    i know Microsoft Project Server Queue Service 2013 : it will be use full for project jobs such  as save , publish checking checkout .....


    Thank You, Kumar KSV


    0 0

    We have recently migrated a customer's Project Server 2007 instance to Project Server 2013. While opening some of the projects in PWA to edit the project custom fields, we encountered an error "This Web Part was unable to load.". Further investigation found that it was due to some non-mandatory custom fields having lookup tables and graphical indicators, but were entered as blank. We did not have any problems in Project Server 2007. Is there any solution for this?

    The ULS log shows the following error: 
    [bucketHash:E8DACC42] Webpart ProjectFieldPart failed in PageLoadComplete. Unique ID: 06385c9c-53dd-20d6-7f2f-37a33f0b405c System.InvalidCastException: Cannot cast DBNull.Value to type 'System.Guid'. Please use a nullable type.     at System.Data.DataRowExtensions.UnboxT`1.ValueField(Object value)     at Microsoft.Office.Project.PWA.CustomFieldUtil.<BuildCFInputRow>b__0(DataRow row)     at System.Linq.Enumerable.WhereSelectEnumerableIterator`2.MoveNext()     at System.Collections.Generic.List`1..ctor(IEnumerable`1 collection)     at System.Linq.Enumerable.ToList[TSource](IEnumerable`1 source)     at Microsoft.Office.Project.PWA.CustomFieldUtil.BuildCFInputRow(Control ctlParent, CustomFieldsRow cf, String cfID, Hashtable htValues, ArrayList clientIdAl, ArrayList divBtnPairs, Boolean useSecondaryUid, Boolean fieldReadOnly, Boolean isBulkEdit, String currency, Boolean loadDefaultForLU, Boolean forceSingleValue, LookupTableDataSet ltds, Nullable`1 serverSeparator, Page page)     at Microsoft.Office.Project.PWA.WebParts.ProjectFieldPartBase.RenderReadWriteProjectField(Guid customFieldGuid, ProjectFieldDisplayModel customFieldInfo, Literal lblName, Literal lblDescription, PlaceHolder pchCFControl, String[] containingElements)     at Microsoft.Office.Project.PWA.WebParts.ProjectFieldPartBase.ProcessCustomFieldControl(Guid customFieldGuid, Literal lblName, Literal requiredControl, Literal lblDescription, PlaceHolder pchCFControl, String[] containingElements)     at Microsoft.Office.Project.PWA.WebParts.ProjectFieldPartBase.ReplacePlaceHoldersWithCustomFieldControls()     at Microsoft.Office.Project.PWA.WebParts.PWAResiliencyPart.PageLoadComplete_ResiliencyCallback(Object sender, EventArgs e) StackTrace:  at Microsoft.Office.Project.Server.Native.dll: (sig=85ae470f-554c-4a8c-992e-92aeb657c829|2|microsoft.office.project.server.native.pdb, offset=3C1E) at Microsoft.Office.Project.Server.Native.dll: (offset=1255D)




    0 0

    In one of the resource availability views there is no colors except the blue color when more than 10 resource are selected

    Repro steps:-

    1-     Go to Project Tab

    2-     Choose either Build team or Resource plan

                 If you will choose resource plan then choose Build team after

    3-     Select more than 12 resources

    4-     Click on Resource availability

    5-     New  IE window tab will be opened with the default view (Assignment work by resource)

          6- As you see here there are 12 resources selected with 12 Colors assigned for each resource

    7-     Now go to views in Ribbon and change it from Assignment work by resource to Remaining Availability

    8-      As you see all resource are in blue and the same with bars

    9-     Now untick two resources from the right side list to decreasing the selected resource to 10 or less

    10-     Now colors are back to the graph

                  So why in Remaining availability has a limit of 10 resource selected to show colors ?


    Karim El Zarka, MCTS Sharepoint 2010 , MCITP SharePoint Administrator 2010 Whenever you see a reply and if you think is helpful, click "Vote As Helpful"! And whenever you see a reply being an answer to the question of the thread, click "Mark As Answer


    0 0

    Hello,

    I am hoping someone can assist with the error we are encountering when trying to edit a project from the PWA in Project Server 2013.  I can click on the project name and go to the detail page and I can click and see the schedule.  However, if I click on a task in the schedule and attempt to edit it, I receive the following error:

    'An error occurred while opening your project. Give us a few minutes and try again. If this happens again, contact your administrator.'

    At this point I must click cancel twice to get rid of the error pop-up message.  At this point, I am no longer able to look at the schedule of the project either.  Can someone assist with this issue?

    Thanks