I cannot change the Tracking Method in PWA Server Settings

Navigating in PWA to Server Settings>Task Settings & Display>the option to select tracking method is completely grayed out and the following is selected:  Hrs of Work Done per Period and...

View Article


Team member in PWA>My tasks cannot enter actuals for specific tasks

Hi, We are using PS 2007. A team member is assigned 4 tasks, under My tasks in PWA where he enters actuals for 3 tasks he is able to enter actual work (timephased view)whereas the 4th task is not able...

View Article


What permission restricts "Site Actions Menu" from Sharepoint Team Sites?

I have a user group where the following permissions are not enabled:  "Manage List in PWA" and "Manage Sharepoint Foundation".  Users of this group are still able to see site actions and more...

View Article

''There was an internal error applying the updates" in Approval Center...

Using Project Server 2010Single Entry Mode, Task type: Fixed DurationStart Date: 2/15/2011, Finish Date: 5/31/2011Dear All,My client has a project having 10 task for each resource. Initially the...

View Article

Issue in MS Project professional 2007

Hi,I have an issue in MS Project professional 2007, i open a plan from project server 2007 and tried entering duration 1.5 day for a task.If i press enter the value changed to 1 day.I cannot enter...

View Article


Change date format of the fields in project center view or project view in...

Hi Guys,I am epm consultant and currently working on epm 2007.i got one requirement from my client that in project center/Project views they want different date format of the fields(Project/Task). i do...

View Article

Project Site Library notification

Hi All,We in our office have successfully set up Project Server 2010 integration with SharePoint. We currently have around 40 active projects in our Project Center.We are also trying to maintain...

View Article

CustomFieldRequiredValueNotProvided error!

I get this error when trying to create a new project to which i have added a new CustomField.I have set all the values needed for the CustomField yet I am still getting this error...Here is my code:...

View Article


Upgrading from EPM2007 to EPM2013

Hi,I am working on a project which is about upgrading existing EPM2007 to EPM2013 for a logistics firm. Their existing infrastructure has one server farm containing one MS SQL Server and one EPM...

View Article


is it possible to have more than 11 baselines? If you generate a baseline for...

Hi All,I'm using Project Server 2010, and the questions are already there in the title.A Project Manager asks me if it is possible to create more than 11 baselines. He asks me, too, if the system...

View Article

Project Server 2013. Do I need to upgrade to Exchange 2013

Hi,We recently setup Project Server 2013. We currently run exchange 2007.Do I need to upgrade to exchange 2013? If so, what features and functionality will we loose if we don't upgrade?Thanks

View Article

PWA 2010 saving custom filters

Can pwa users create filters and then save them? I'm guessing the answer is the same as it was for 2007 - no.thanks.

View Article

Project Server 2013: The view failed to load. Press OK to reload this view...

Error Description: The view failed to load. Press OK to reload this view with the default settings. Press Cancel to select another view.Step to resimulate: click on timesheet on the quicklaunch, View...

View Article


Whever I try to create a project using workflow error occurs Operation still...

The Create operation has been queued, but is taking longer than expected to process. To check the status of the creation queue job, visit the My Queue Jobs page. Once the job has completed, the new RIL...

View Article

Project Server 2010/ Project Professional 2010 VBA/ Check if current group...

Dear Forum,i'm looking for a method to check via VBA-code if one of the groupings in the current project uses a field which is based on a lookup-table. How can i access properties of the fields a...

View Article


epm 2010 architecture

what is Single, Two-tier, Three tier architecture of Microsoft Project Server 2010?

View Article

what are the advantages of linking between risks and tasks?

when we add new risks we can use "custom commands> link Items" and link tasks or documents or issues to risks.and we can set the relation type between them such as : risks affect task or task...

View Article


Project Server 2010 : OnUpdating Server Event Handler error

Hey,I have developed class library and used it for event handlers, and it is hitting the code.on the OnUpdating function after canceling the event, a red error message appears on the page (in the...

View Article

No permission to read project server enterprise global file (Server 2010)

Hello all,I saw some threads about this error message but I get it in different circumstances.I have a PWA environment that was working fine.I start to get the messge "no permission to read project...

View Article

How to inactive the project

i am using project server 2010, i want to put the project inactive since the project is put to OnHold due to some technical reason. Project is having some completed task with actuals, some task with in...

View Article