The User Synchronization for PWA Workspaces taking too much time to complete

Hi All,My env is PS 2007 sp2 sql server 2005 sp3Last week friday, I did a FARM restore from Prod to QA after that in queue "The User Synchronization for PWA Workspace" job starts automatically to map...

View Article


Project Server Alerts generating subscription notification errors in Exchange...

I've followed the published guidelines for setting up task synchronization between Project Server and Exchange Server, and all of my users are getting notifications, both automatically on tasks...

View Article


Visual Reports in MS Project

hello and good day!please help me with this..is it possible that MS Project will auto generate visual reports with the use of excel and save a file in server? and can the save file from excel will...

View Article

Project server 2007 timesheet add line error.

Hi All, I have a Project Server 2007 Dec 09 CU environment, here one of my resource is facing timesheet web part unexpected error, so for the same when I have looked at ULS logs I have found below...

View Article

Complete Through (task field)

Hi Can I use Complete Through (task field) in a formula: iif([Complete Through] >% complete,yes,no)?If not how can I indicate that i have a problem with my progress?Thanks, elaine 

View Article


Resource Management Case Study - anybody know of one?

Hi folks,I've been looking thru a lot of the blogs and other documentation available online as well as the (very good) Project Server Experts books and I still haven't been able to get a good sense of...

View Article

Project Server 2010 - Unable to upload documents in the Project Documents...

Hi,For 1 of the projects, in the Project Tab, click on "Documents" -> Project Documents.  Click on "Add document".   When I click "submit", I get an "Error: Access Denied".   If I click "Go back to...

View Article

Project Server 2010 Permissions Issue

Hello,I've added an user in Project Server, who should only be able to view certain projects. This user belongs only to a custom group (all default groups were removed from users membership due to a...

View Article


Can a task level field be added to the webpart "my timesheet" - PS 2007

Hi, We are using PS 2007.When the user clicks on "My timesheet" and creates one, we get the tasks displayed along with the administrative time. in that view, can we include the task level fields...

View Article


Not able to fetch attributes with Person or Group data type from Project...

Hi,We have Project Server 2007 WSS 3.0 env. I have one custom list which contains users information in particular team site. I need to develop a SSRS 2005 report to fetch few attributes from the list....

View Article

Use PDP's or document for project fields

We're newbies with Project Server and are just planning our implemtation and have a question about how to design our information gathering process.Currently we have a New Product development process...

View Article

track down lookup_table_structures conflict

I have a project file that was connected to the project server at one point before. It is now kind of orphaned and I would like to import it back to the server. However, it is always complaining about...

View Article

Project Server 2010 import problem

I have couple of projects exported on Project Server 2010 as xml and I need to import them.We're using Project Server 2010 SP1 with June 2012 cumulative updates. Microsoft told me that I need to export...

View Article


Project Server 2013 - New -> Project, creates groups at the root site level,...

I created an Enterprise Project in PWA and moving up to the root site settings I see there was the four basic groups created there just for this project. This is not acceptable when there will be 500...

View Article

Can secondary admin of sharepoint farm can deactivate and delete wsp template...

HI  I have uploaded some wsp file  ( project server ->site action-> site setting ->gallery->solution) as primary admin of sharepoint farm and adminstrator of PWA .So can I delete using...

View Article


Unable to Update Custom Field Values for Inactive Users ?

Hi,Unable to Update Custom Field Values for Inactive Users.I don't want to have the inactive users in my reports where I have data filtered by the custom fields associated with this inactive users ?Pls...

View Article

Project 2007 cost resources

I am using PS2007 with SP3.We are experimenting with enterprise cost resources.  I have set up tasks in my project schedule to track hard dollar costs.  The tasks do not include any other type of...

View Article


Master project with subprojects and interaction with PWA

We have a large project that we need to break into sub projects and have those under a Master Project.  We are new to Project Server 2010 and Project Professional 2010.  My questions are...1.  I assume...

View Article

Portfolio Manager - Project Server 2010

Hi! first of all sorry for the gramathic mistakes but english is not my native languagge (:In Departament A, A1 is the Portfolio Managers and A2,A3,A4 are Project Managers; and in Departament B, B1 is...

View Article

Technet Library

Hey,I was trying to read some documentation on Project Server 2010 in the Technet Library(http://technet.microsoft.com/en-us/library/cc197578.aspx)[which was saved in my favourites some days back], it...

View Article