I use 2 monitors, my laptop and an extra monitor. I want to have 2 separate instances of MS Project (2010) open, one in each monitor, so I can view both together. I've been unable to achieve this. Anyone know how?
I use 2 monitors, my laptop and an extra monitor. I want to have 2 separate instances of MS Project (2010) open, one in each monitor, so I can view both together. I've been unable to achieve this. Anyone know how?
how to configure windows admin center with single sign on the Microsoft write in there docs the following
Single sign-on when deployed as a Service on Windows Server
When you install Windows Admin Center on Windows 10, it's ready to use single sign-on. If you're going to use Windows Admin Center on Windows Server, however, you need to set up some form of Kerberos delegation in your environment before you can use single sign-on. The delegation configures the gateway computer as trusted to delegate to the target node.
To configure Resource-based constrained delegation in your environment, run the following PowerShell cmdlets. (Be aware that this requires a domain controller running Windows Server 2012 or later).
$gateway = "WindowsAdminCenterGW"$node = "ManagedNode"$gatewayObject = Get-ADComputer -Identity$gateway$nodeObject = Get-ADComputer -Identity$nodeSet-ADComputer -Identity$nodeObject -PrincipalsAllowedToDelegateToAccount$gatewayObject
how to find my node i try a lot and it didnt work my server name is "vsv-wac01h" and its joined to my domain
In the Project Server Online Version, When trying to fetch the Project Details with the below endpoint - (https://go2g.sharepoint.com/sites/pwa/_api/ProjectServer/Projects) with required header details, We ended up with the below exception.
<?xml version="1.0" encoding="utf-8" ?>
<m:error>
Eventually the Projects available as displayed in the UI are not returned and blocks for further configuration required to perform so. Appreciate, if I get some guidance here to deal with this?
Hi,
In the operational policies > additional server settings I can only set the resource capacity range settings 1 - 36 months.
is there a solution to change this?
Maybe with an add-on?
Rgds
Sander
Hi, can someone explain the Resource Capacity Settings aspect of the Month behind setting? If I have it set to 1 month only what does it show and what does it Not show? If I have a resource which started in Jan 2016 will their capacity still show at 100% for Jan, Feb, Mar, Apr, May, Jun and into the future or will it only show 100% from June onwards ie from one month ago?
Thanks
Steve
We are using Project Online and the default Project Center view was deleted by accident. No users are able to access Project Center now, it just displays "Loading" and never completes the process. Has anyone else had this problem and if so, how did you fix it?
Thanks in advance for your help.
Hi
I hope someone can help
I have created a sharepoint (2016) task list through MS Project Professional (2016) online to monitor a few tasks which do not really require a full project plan.
This works well, however I have had issues with team members filling it out inconsistently so I created a few enterprise custom fields to fix this.
I have managed to map some of my custom fields between Project and SharePoint, however, any custom field which relates to a lookup table does not appear in the list to map.
Is it possible to map lookup table enterprise custom fields from Project to SharePoint?
Thanks for your help in advance
Matt
Hi team
Gooday
need help \ advise on how i can query the registered SMTP for pwa 2013 and change the same via a script.
1) we are changing the SMTP server and hence i need help with a query to find out the SMTP details per PWA url
bascially i am trying to query out the SMTP mail server: which can be found under alreats and reminders in central admin
2) is there an auntomated way i can changed the SMTP detail in PWA above via a script as there are more than 1000 PWA urls and doing this maunally is very timeconsuming.
any advise , help appriciated
Hi All,
I am creating a SSRS report at project level, where i only have to show those projects on which logon user have access. my challenge that I an unable to find table in database, which holds build team information.
Project Server version :- 2013
Thanks
المركز الرئيسى صيانة بيكو الوكيل ٠٢٣٥٧١٠٠٠٨
Beko ٠١٢٢٣١٧٩٩٩٣//٠١١٥٤٠٠٨١١٠//٠١٢٢٣١٧٩٩٩٣
٠٢٣٥٧١٠٠٠٨/٠٢٣٥٦٩٩٠٦٦
وكلاء صيانة ثلاجة بيكو , وغسالة بيكو
ثلاجات بيكو , ايس ميكر بيكو ، ديب فريزر بيكو ,غسالات بيكو
٠١٢٢٣١٧٩٩٩٣//٠١١٥٤٠٠٨١١٠//٠١٢٢٣١٧٩٩٩٣
٠٢٣٥٧١٠٠٠٨/٠٢٣٥٦٩٩٠٦٦
صيانة توكيل ثلاجة بيكو وغسالة بيكو
صيانة توكيل ثلاجات بيكو ٠١٠٩٦٩٢٢١٠٠
صيانة توكيل ديب فريزر بيكو ٠١٢١٠٩٩٩٨٥٢
صيانة توكيل ايس ميكر بيكو ٠٢٣٥٧٠٠٩٩٤
صيانة توكيل فريزر بيكو ٠١١٢٩٣٤٧٧٧١
Beko Beko Beko Beko
توكيل بيكو , صيانة , بيكو , صيانة بيكو , ثلاجات بيكو , غسالات بيكو ,Beko
We are using Project 2013, Professional and Server, but not Project Online at this time. When a team member goes into the Project Center and clicks on a schedule to view it (in PWA not Professional), they can still see the Strategic Impact link in the left hand side menu. Removing the link from the Quick Launch menu just removes it from the main pages, not the schedule view. Is there any way to remove just the Strategic Impact link so that team members don’t even have it as an option to click on?
Thanks,
Tanya
Hi, and thank you for reading.
This is probably a newbie question, but I have not been able to resolve this myself.
I would like our resources to log in to the PWA and provide their updates per task. Sadly, when they go to the “Tasks” page, it is blank. Is this even the correct page? J
Thank you in advance.
GeorgeHi - I added a user to a custom group/category that grants them access to a subset of projects. The user can now see the projects under their Project Center even though they are not part of the Build Team.
However, the user does not have access to the corresponding Project Workspace sites - is this expected?
Hi everyone.
Now, in Microsoft Project (windows app) in settings, I selected next check boxes:
On Project Server I have a custom app (script, basically on API MS Project Server - what is this?), which is automatically send messages all users, collect "% complete" and loaded this "%" in to Projects.
But this app loaded "% complete" without selected settings.
Now, after set "%" for future task in custom app - its wrong:
Questions:
1. Where in Project Server swith on this settings?
2. Where in API MS Project Server shitch on this settings?
Thank you.
-------
p.s. I ask this question in russian segment, but it is dead. LINK
PL
Dear Techie
My org structure wise i want fetch the data,
Org Structure like
CEO-->Department1-->Subdep-1
CEO-->Department1-->Subdep-2
CEO-->Department1-->Subdep-3
CEO-->Department2-->Subdep-1
like wise when i check msp_epmresoureuserview that top level of RBS and below resource wise not able to fetch the
data, please help me.
Great appreciate to your help.
Hi,
Trying to embed Project Online PWA site within a web application (Not in a SharePoint env) via Iframes. Is it possible? or not?
Since it is project online, I don't have full command to update the xml files to make the changes. It is not allowing me to edit the site pages from SharePoint designer too.
If it is possible, please provide me the workaround.
Thanks.
Hi Experts
Is there any way to disable / hide the below highlighted option in Time sheet (PWA 2016)
I have denied the permission create new task and self assignbut no luck
Any help would be appreciated
Regards
Santosh
There are no mistakes; every result tells you something of value about what you are trying to accomplish.