Fiscal Year no longer displaying in project server 2010 views

0
0

Previously, our MS Project views would show the fiscal dates on any of the time-phased views. Recently we noticed that the fiscal period is not displayed on any of the views in project regardless of whether the "use fiscal year" option is checked or not. Our fiscal calendar is defined in PWA (no changes to it in recent months) and the OLAP cube still has it as a dimension and correctly shows the FY periods.

The only changes recently implemented was an upgrade to the Dec 2014 CU.

Any thoughts or ideas would be appreciated.

Dan


Excel access to Project Server

0
0

I am trying to create an Excel file that can access MSProject files stored in an Enterprise Server

I have a nice bit of VBA code in Excel that, given a file path, will go to a Project file, select the Timeline and then paste it into a sheet. Very useful for creating reports that combine timelines with other metrics. At the moment however it only works on test projects that I have saved to a standard file structure ie C:\documents\... etc

What I would like is to be able to access project files that are stored in an Enterprise Server. I haven't been able to find a standard file path to any of the 'Live' projects I'm working on

Can anyone help?

Sharepoint 2007 Serach option is not working. Need your Valuable suggestion..

0
0

While seraching with any Document library or Team discussion. It Says "The Web application athttp://servername:port could not be found. Verify that you have typed the URL correctly. If the URL should be serving existing content, the system administrator may need to add a new request URL mapping to the intended application."

>  Allowded index search page enabled for all content

>  Serach service is running in Operation > Topology and Services > Services on Server and Started.

> Application Management > Content Database need to add always by selecting the web application and the specified database. If i click on the other tabs, again when i entered to content database no database is there. Always, i need to add it manually.

If the content database is Started also , Showing the same error for all sites.

Can anyone please help me to fix the issue.


Tilak Debnath System Engineer(MCP) Kolkata,India

MS Project server 2013: the Project Server Service Application doesn't appear

0
0

Hello,

we installed MS project server 2013 (after SQL and Sharepoint) and executed configuration wizard.

But, the Project Server Service Application doesn't appear in "Manage Service Applications" or "Services on Server" of the SharePoint Central Administration.

How can we get it? What is the reason?

Thanks and kind regards 


Murol


PWA Tasks - Task Hierarchy - Missing in 2013

0
0

Hi,

When I was working with Server 2010, I used to configure the reporting page (My Assignments view under My Work) to be grouped byTask Hierarchy in order to be clear about tasks with duplicate names.

In Server Online I don't see the Task Hierarchy as option in the group-by box.

Is there another way to do it?

Regrads,

Barak

Custom Fields Availability to Resource Assignments View - PWA 2013

0
0

Hello,

I have created some enterprise custom fields in my server.

When I go in PWA (Online) to Manage Views --> Resource Assignments --> Summary, some of these fields are available and some not.

A specific field I want to use is a task calculated test field. I marked it to roll down to assignment level but it didn't work.

Can someone explain me the logic?

Regards,

Barak

Resource Calendar in Project Server 2013

0
0

Hi,

I need to change the resource calendar for a specific project in MS Project Server 2013 but the calendar field is greyed out.

I could not change the calendar.

Can anyone tell how to change that?


K.Gokulraj

Status Reports in Project Online

0
0

Hi,

In PWA 2010 there is a status reports page where you see status reports and can request new ones.

In PWA Online I found the status reports page but didn't find where to request new status reports or submit an unrequested one.

Regards,

Barak


PWA (Resource Center) vs. Project 2007 - % Work Complete Discrepencies

0
0

Hello,

On Project 2007 (12.0.6607.1000) SP3 MSO (12.0.6718.5000)

I am having an issue where a project will have a task/milestone showing 100% complete in MS Project, but in PWA under Resource Center, the task will show 0%. 

The resources are manually adjusting their % Complete and % Work Complete to 100% when finished. For my purposes, I am only interested in trackingmilestones for 100% completeness.

Searched online but the only solutions I've seen are for Project 2003.

Any help would be appreciated.

Thanks,


AD sync: Can't save Active Directory group for Project Server groups

0
0

Hello,

I have a Project Server 2013 June 2014 CU with 2 PWA instances. One of these doesn't save the Active Directory group when editing the Project Server Security group. No error when editing and saving (even not in ULS logs). But it doesn't show the AD group in the "manage groups" overview or when opening the group. I already switched from Project Server permission mode to SharePoint mode and back.

thanks in advance for any hint,

Gerd


Gerd Walter

Tasks missing from project plan even though they are in database

0
0

We are having strange issue in Project 2013 with specific project.

we see reports are showing one task with assignment but not showing in pwa or in client. due to this, $ are mismatch.

any suggestions to get that task to visible in Project plan(pwa or client), so that we can edit the $


S.Venkata Appaji

Filters in List Views - what variables like [ME] are available?

0
0

Hi

If you create a view in a list you can use [ME] or [TODAY] to filter.

What other options are there? Does anyone know of a list of all of these context sensitive parameters?

Thanks for the help!

Ryan

Replacing Enterprise Project plan

0
0

HI, is there a method for replacing a project plan without having to fully the delete the project and its custom fields? The only method I can think of is to delete all rows in the existing project and then to insert the new plan as a sub-project and untick the link to plan tickbox as I do so. This will bring the new plan data into the old albeit now blank plan?

any ideas?

Steve

Error 102 Error occurred in deployment step 'Activate Features' Workflow XAML failed validation

0
0
hello,

am facing this issue when deploying workflow declarative through Visual studio

Error      102         Error occurred in deployment step 'Activate Features': Microsoft.Workflow.Client.ActivityValidationException: Workflow XAML failed validation due to the following errors:
Cannot create unknown type '{wf://workflow.windows.net/default/f83ba7ee-2710-4c58-b0a1-17f6c729b624/a2922650-a0a1-433f-b4d1-1ba4ca83bfd3/$Activities}ActCode'. HTTP headers received from the server - ActivityId: 6428bb22-5a1a-412e-8940-b2b420d5be2b. NodeId: VEPM-NCDR-01. Scope: /SharePoint/default/f83ba7ee-2710-4c58-b0a1-17f6c729b624/a2922650-a0a1-433f-b4d1-1ba4ca83bfd3. Client ActivityId : 0852b3ef-55ba-4e08-b622-80dc31ce530d. ---> System.Net.WebException: The remote server returned an error: (400) Bad Request.
   at Microsoft.Workflow.Common.AsyncResult.End[TAsyncResult](IAsyncResult result)
   at Microsoft.Workflow.Client.HttpGetResponseAsyncResult`1.End(IAsyncResult result)
   at Microsoft.Workflow.Client.ClientHelpers.SendRequest[T](HttpWebRequest request, T content)
   --- End of inner exception stack trace ---
   at Microsoft.Workflow.Client.ClientHelpers.SendRequest[T](HttpWebRequest request, T content)
   at Microsoft.Workflow.Client.WorkflowManagementClient.SendRequest[T](HttpWebRequest request, T content)
   at Microsoft.Workflow.Client.ActivityManager.Publish(ActivityDescription description, Boolean overwriteXClassName, Boolean terminateDependentInstances)
   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowManagementClient.PublishActivity(String serviceGroupName, ActivityDescription activity, Boolean overwriteXClass, Nullable`1 terminateInstances)
   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowDeploymentProvider.PublishActivity(FabricWorkflowManagementClient client, ActivityDescription activityDefinition, String serviceGroupName)
   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowDeploymentProvider.<>c__DisplayClass5.<PublishDefinition>b__4()
   at Microsoft.SharePoint.WorkflowServices.WorkflowServiceContextExtensions.InvokeWithEcosystemRetry(WorkflowServicesContext context, EcosystemRequiredMethod method)
   at Microsoft.SharePoint.WorkflowServices.FabricWorkflowDeploymentProvider.PublishDefinition(WorkflowDefinition workflowDefinition)
   at Microsoft.SharePoint.WorkflowServices.WorkflowDefinitionStorageEventReceiver.PublishDefinition(SPItemEventProperties properties)
                                0              0              ListPro


any help would be appreciated!!!!

Thanks regards, Vignesh.

Timesheet Status = Error (Project Server 2010)

0
0

Hi

We have a number of timesheets with a status of ‘Error’ which seems to give us some trouble…

When the user goes to ‘Manage Timesheets’ the timesheet is listed with the logged hours and with a status of ‘Approved’. When you however click of the timesheet to drill into the details, the timesheet states that the status is ‘Error’.

If the line manager who approves the timesheets goes to the ‘Approval Center’ page and then on the ‘History’ dropdown select ‘Timesheets’, the page loads with an error message above the we part which states for example:

  • Timesheet 'My Timesheet', Stephan Smit, 2011Week01 (2011/01/02 - 2011/01/08): An error occurred while communicating with the server. Check connectivity with your administrator to determine whether further action is necessary.

In order to try and fix this we then try to recall the timesheet so that we can redo or delete it, but recalling it does not take effect – it tries to recall it forever but never completes the recall.

This means we cannot fix the timesheet and we encounter this issue with quite a number of users, but don’t seem to be able to determine reproduce steps for this.

We are using Project Server 2010 and are using the integrated mode for timesheets.

This is quite a critical issue and would appreciate any advice on a workaround as well as a possible fix for this.

Kind Regards

Coenraad Swanepoel

PS 2010 - Timesheet Approval Daily Hours Review Issue

0
0

When one of our PM's logs into PWA to approve his time in PS 2010, he only sees the total hours and not the hours by day...

The rest of us see hours by day and the total.  Prior to today, he did too.  I checked his settings and everything seems fine.  Can you give me a clue as to where to look?

Thanks,

Laura

External hard drive only works on new computer not the older one

0
0

G'day,

I have a 1 TB external Hard Drive.  It is recognized by my new computer but not by the 8 year old one.  I use Windows 7 and it is updated on a daily basis.  Please could somebody tell me what I need to do to get the older computer to recognize the E H Drive please.  The hard drive is a WD and is almost new.

Cheers Perry

Reporting in Project Server - Create S-Cost curve

0
0

Hello,

I am attempting to create reports for Project Server using Excel 2010 and PowerQuery+PowerPivot for my company. Among the requiered reports, I was asked to create a S-Cost curve (acummulated cost of project).

The idea is to create a pivot chart in which selecting a project from the list, I can get the accumulated cost from the last three months. I am trying to do this by using the OData file TimePhasedDataSet. The problem I face is that I can't pass to PowerPivot all data from TaskTimePhasedDataSet and if I select data with PowerQuery from the last three months, I can't know how much was actually spent at the beginning of this period. 

I hope anyone can bring light to this or recommend other tool to achieve this.


ISP address problem

0
0

Sorry, I am having trouble finding the correct forum.  I hope this is it.

My email is connected via cable to Bright House.  If my friend, using his computer at my house, accesses the internet through my cable router and then goes to his own provider and sends an email, which ISP will be in the header of that sent email.  In other words, can my ISP be identified because he used my cable router to access his provider?

Project Server 2013 - Cannot reactivate connected SharePoint site

0
0

Hi All

After experiencing the error code of death (23000), I deactivated the connected sharepoint site and now cannot reactivate it as I get a message saying that the project is currently being updated, however it is checked in.

Anyone have any ideas what might be wrong?

Regards

Sean